ESE NOTES is a website dedicated to education. We hope that the information on this website will be useful to students and those preparing for competitive exams.
This educational website also aims to inform visitors who want to learn more about various subject areas. Finally, we hope that this website will aid readers in gaining a better understanding of the various topics.
SUBJECT
Set Back Distance: It is clearance distance, required from the centre line of pavement/road to the obstruction in ode to maintain the adequate sight distance
Transition Curves: When a vehicle traveling on a straight road enters into a horizontal curve instantaneously, it will ca discomfort to the driver. To avoid
ExtraWidening: Extra width provide to Road at horizontal curve is called extrawidening. Note: This topic is part of the second chapter of Highway Engineering. I
Method of Obtaining Superelevation: Introducing superelevation on a horizontal curve in the field is an important feature in construction. The full super-elevation is attained by